Wood based panels manufacturer Pfleiderer has awarded the Dieffenbacher Group with the contract for supplying a new particleboard line.

The panel plant is expected to arrive in Neumarkt in the summer of 2013, where it will be installed as part of ongoing modernisation and expansion measures being carried out at the production site. The panel plant is then set to be put into operation during Q1 2014.

At the same time an undisclosed customer in Asia has awarded Dieffenbacher with a contract for an OSB plant.